The first thing to settle on a new deck is whether it fastens to the house or stands on its own out in the yard. That choice decides how deep the footings go and what the city asks for, so it's where we start with you.

A few things around the back of your house can change how the deck is planned and built.

- A basement window well, or a bay window, on the wall the deck comes off
- A back door upstairs, well above the yard
- The spot in the yard where the stairs will come down

- 15+ years experience
- Licensed
- Insured

### Get Your FREE Estimate

## The Parts of a New Deck

For deck installation in Fort Collins or nearby, [Fort Collins Deck Contractors](https://fortcollinsdeckcontractors.com/) can build your new deck from pressure-treated wood, cedar or composite.

### What a new deck includes

- Concrete footings, set below the frost line when the deck fastens to the house
- The frame: posts, beams and the joists the boards sit on
- A ledger, the board that ties the frame to the house, on an attached deck
- Deck boards in pressure-treated wood, cedar or composite
- Stairs down to the yard, where the deck needs them
- Railing along the open sides, where the deck needs it or you'd like it

## Attached to the House or Standing on Its Own

**An attached deck is fastened to the house with a ledger** and stands on footings out at its far edge. It's the kind you step onto straight from the back door. In Fort Collins, an attached deck needs a city permit at any height, even when it sits a step off the ground.

**A freestanding deck holds itself up** on footings all the way around and doesn't touch the house, so it can sit out in the yard or near a tree. Its footings don't have to go as deep, and only a small, low deck standing on its own can skip the city's permit.

Which one suits your yard comes down to where you'd like to sit and what's on that side of the house.

## Things on the Back of the House That Change the Plan

**A basement window under the deck.** If the deck will cover the well of a basement escape window, Fort Collins asks for enough clear room between the top of the well and the underside of the deck for the window to still work as a way out. We lay out the frame around it.

**A bay window or a bump-out.** When the deck would fasten to a part of the house that hangs out past the foundation, like a bay window, the city asks for engineered plans for how it attaches. We look at that wall early, so it's part of the plan and the price from the start.

**A back door up on the second floor.** A deck that high stands on tall posts and needs a long staircase to reach the yard, with railing along every open side and down the stairs.

## Stairs and Railing on a New Deck

**When a deck needs railing.** Fort Collins asks for a guard where a deck sits 30 inches or more above the ground, measured three feet out from its edge. A deck that stays lower than that can go without one, if you'd rather keep the edge open.

**Where the stairs land.** The city asks for a solid, level landing at the top and bottom of deck stairs, such as flagstone or concrete, so the last step doesn't come down onto the lawn.

**A light at the top of the stairs.** Deck stairs need one, and in Fort Collins a new one must be shielded and point down at the steps, the dark-sky kind, which keeps the light where you're walking.

## Picking Your Deck Boards

On a new deck, you pick the boards you walk on and the railing around them: pressure-treated wood, cedar, or composite decking, which a lot of people call Trex. If you can't decide, we can price your deck both ways.

Some parts of Fort Collins fall inside the state's wildfire map, where the wildfire code can reach the deck boards. We check what applies to your house before the boards are picked.

## New Railing or Stairs for the Deck You Have

If the frame and boards on your deck are in good shape and it's the railing you've grown tired of, a new railing can go on by itself, and so can a second staircase to the yard.

Sometimes a railing only has a few loose pieces, and fixing those is a smaller job than a new one. If a repair will do, we'll tell you. In Fort Collins, replacing the railing or the stairs on a deck takes a permit.

## Deck Installation Prices Around Fort Collins

For a new deck of about 16 by 20 feet, built against the house with three steps to the ground and railing on its open sides, these are the typical ranges around Fort Collins. A new deck's price already includes its railing. The two railing prices are for about 50 feet of new railing, enough for the open sides of a deck that size, on a deck you already have.

### New wood deck (pressure-treated), about 16 by 20

$10,000 to $20,000

### New composite deck, about 16 by 20

$13,000 to $28,000

### Wood railing on a deck you already have

$1,500 to $3,000

### Composite railing on a deck you already have

$4,000 to $8,500

### What can raise or lower your price

Size A deck bigger than 16 by 20 costs more than it would at 16 by 20, and a smaller one costs less.

Height The higher a deck sits, the more it takes to build, and one off a second-floor door runs past these ranges.

Cedar Cedar boards cost more than pressure-treated ones.

A hot tub, pergola or cover on the deck Fort Collins asks for engineered plans for any of them, and those plans add to the price. If you might add one later, tell us at the start, because the footings and frame are much easier to plan for it before they're built.

## How Your New Deck Gets Built

### We look at where the deck will go

Before anything is dug, we look at the door the deck comes off, the ground below it, how high the deck needs to sit, which way the stairs can run, and anything on that wall the deck has to work around.

### The footings go in

We dig the footing holes, below the frost line when the deck is attached to the house. On a deck with a Fort Collins permit, the city looks at the holes before any concrete goes in.

### The frame goes up

Posts go up on the footings with beams across them and the joists on top, and on an attached deck a ledger fastens the frame to the house. The city inspects the frame before the boards cover it, while every connection can still be seen.

### Boards, stairs and railing go on

The deck boards go down across the joists, and the stairs and railing go on last. The city's final inspection comes after that.

## Questions About Building a New Deck

### What is the most expensive part of building a deck?

The deck itself: the frame and the boards across it, priced by how big the deck is and what the boards are made of. A typical 16 by 20 deck here runs $10,000 to $20,000 in pressure-treated wood and $13,000 to $28,000 in composite, with a railing to match its boards. The railing comes next, and the few steps from a typical deck down to the ground are a small part of the total.

### What are the different types of deck railings?

Wood, composite, metal and glass are all used for deck railing, and so is cable railing. Any of them can go on a new deck or replace a railing that's there now. We'll help you pick the one that suits your deck and the view you have from it.

### What is the most cost-effective type of deck railing?

Between the two railings priced on this page, wood costs well under composite: about 50 feet of new wood railing runs $1,500 to $3,000, and the same run in composite $4,000 to $8,500. On a new deck, a wood railing on wood boards or a matching composite railing on composite boards is part of the deck's own price, so there's nothing to add for it. Metal, cable and glass railing get priced once we've seen the deck.

## Guides for Deck Installation in Fort Collins

### [What a New Deck Costs in Fort Collins](https://fortcollinsdeckcontractors.com/guide/new-deck-cost-fort-collins/)

What a 16 by 20 deck runs in wood and in composite, and the things that can make yours cost more or less.

### [Composite or Wood for Your Deck](https://fortcollinsdeckcontractors.com/guide/composite-vs-wood-decking/)

How the two compare on price now and on the upkeep that comes later.

### [Do I Need a Permit to Build a Deck in Fort Collins?](https://fortcollinsdeckcontractors.com/guide/deck-permits-fort-collins/)

Which decks the city lets go without a permit, and how the towns nearby handle it.

## More Deck Work We Do

### [Deck Replacement](https://fortcollinsdeckcontractors.com/deck-replacement/)

When the old deck has done its job, we take it down and build you a new one.

### [Composite Decks](https://fortcollinsdeckcontractors.com/composite-decks/)

A new deck, or a replacement for an old one, finished in composite boards.

### [Wood and Cedar Decks](https://fortcollinsdeckcontractors.com/wood-and-cedar-decks/)

How cedar and pressure-treated lumber compare on a new deck.

### [Covered Decks and Pergolas](https://fortcollinsdeckcontractors.com/covered-decks-and-pergolas/)

Shade over the deck, from an open pergola to a solid cover, planned with the deck that holds it up.

## What would it cost to build a deck in your yard?